FEATURES OF THE APPLICATION OF THE COORDINATE METHOD OF MARKING WORK IN THE CONSTRUCTION OF HIGH-RISE BUILDINGS

Received 27.07.2022
Revised 18.10.2022
Published 24.11.2022

Abstract

The article discusses the state of modern technologies of geodetic marking works in the construction of high-rise buildings. It is shown that the use of the coordinate method of geodetic marking works is the most appropriate for the construction of multi-storey buildings

Keywords

Multi-storey buildings monolithic technology monolithic reinforced concrete geodetic marking works coordinate method structures architecture performance photography
Suggested citation
Duyshonbekova, L., & Sultanalieva, T. (2022). FEATURES OF THE APPLICATION OF THE COORDINATE METHOD OF MARKING WORK IN THE CONSTRUCTION OF HIGH-RISE BUILDINGS. Bulletin of the Kyrgyz National Agrarian University, 20(4), 111-117.

References

[1] Avakyan, V.V. (2016). Applied geodesy: Technology of engineering geodetic works (2nd ed.). Moscow: Infa-Engineering.

[2] Avakyan, V.V. (2013). Applied geodesy: Geodetic support for construction production. Amaldanik.

[3] Khametov, T.I. (2013). Geodetic support for the design, construction, and operation of buildings and structures: Textbook. Penza: PGUAS.

[4] Yandrov, I.A. (2007). Possibilities of using satellite methods in the construction process. News of Universities: Geodesy and Aerial Photography, 5, 36-43.

[5] Anger, G., & Moritz, H. (2003). Inverse problems and uncertainties in science. Sitzungsberichte der Leibniz-Sozietät, 61(5), 171-212.